Stone Hut to Melrose

So the ride to Melrose was pretty cool. The lunch was fantastic. The ride back was maybe a little harder than expected, we though, from the advice we had sought from a keen cyclist, that it would be mostly downhill. It wasn't, well not until after Wirrabara, but it was still a good ride, just 2 hours back to Stone Hut.

Next 2 or 3 day ride in late May. Looking forward to it, getting back out with our bob trailers and camping.
Download kml file to view in Google Earth or adapt to use as a navigational aid in a GPS unit |
Stats | Mawson Trail | |
Friday | Friday | |
17/04/2009 | 17/04/2009 | |
Near Stone Hut to Melrose (Mawson Trail) | Melrose to near Stone Hut (via bitument road) | |
Distance | 52.3km | 39.9km |
Start Time | 8.02am | 1.34pm |
End Time | 12.35pm | 3.50pm |
Moving Duration | 3h33m | 1h56m |
Stationary Duration | 1h02m | 10m |
Moving Average | 14.7km/h | 20.6km/h |
Overall Average | 11.4km/h | 18.6km/h |
Oodometer | 52.3km | 92.2km |
No comments:
Post a Comment